The South Butler County School District will pay to have a feasibility study performed on district-owned facilities.
The School Board has approved a $19,000 contract with Foreman Architects Engineers to do a facility assessment, including perimeter sidewalks.
This study is expected to take until May to complete, at which time the engineers will present the board with options.
Together with a demographic study previously approved by the board and currently underway, this feasibility study will provide necessary data when considering possible projects.
Written By: Ryan Saeler for the Butler Radio Network