PennDOT is continuing summer road project maintenance work around Butler County this week.
These activities include bridge repair on Sarver Road in Buffalo Township, as well as pipe replacement, which will be occurring on St. Wendelin’s Road in Summit Township and Reibold Road in Forward Township.
Patching will be taking place on Route 8 in Penn and Middlesex Townships and Route 19 in Adams Township. Crack sealing is planned for Route 8 in Center Township.
Shoulder work is scheduled to take place in Winfield Township along Mushroom Mine Road while rock lining will be occurring on Meridian Road in Butler Township.