PennDOT is continuing early summer road project maintenance work in Butler County this week.
These activities include pipe replacement, which will be occurring on Monrow and Sarver Roads in Buffalo Township and Prospect Road in Forward Township, along with bridge maintenance in Adams, Jackson, Penn, and Butler Townships.
Patching will be taking place on Keister Road in Slippery Rock Township, Oneida Valley Road in Washington and Venango Townships, and North Washington Road in Clay and Concord Townships.
Line painting is scheduled to take place along Route 8 to Route 308 in Center to Venango Townships as well as Route 422 in Butler to Clearfield Townships with shoulder work planned for Saxonburg, Freeport, North Pike, Rockdale, and Dinnerbell Roads in Jefferson, Summit, Winfield, and Penn Townships. Residents in those areas who would like fill dirt should call 724-284-8800.
#ButlerCounty
#PennDOT
#roadwork